Georgia Power
Smyrna, Georgia
Electric generation facility
After Georgia Power completed construction of their new three-unit/840-megawatt combine cycle gas power plant, Brandenburg was contracted to demolish their 1960’s vintage Plant Jack McDonough. This coal-fi red power plant had a generating capacity of 517 megawatts and consisted of a boiler house containing two boilers, the turbine hall, precipitators, an 835-foot tall concrete stack, as well as the associated coal yard facilities and various outbuildings. Once demolition was complete, Brandenburg reused approximately 15,000 cubic yards of concrete, brick, and block that was generated from the demolition of the existing structure as well as importing over 65,000 cubic yards of material to backfi ll the 37-foot deep basement that covered the entire footprint of the boiler house and turbine hall. Brandenburg also performed the decontamination work, which included package and disposal of all hazardous materials such as asbestos, ash silo, ash trench, tank removal including acid and caustic, transformer oil, PCB contaminated concrete slabs, and other hazardous waste. The project started in August 2012 and finished on schedule in January 2014. With over 101,000 man hours, no recordable injuries or near misses, this project is considered to be one of Brandenburg’s most successful jobs, accomplished by well-engineered plans, a skilled workforce, and safe work plan.